NITN | @notintownlive | 25 Jul 2022, 04:07 am

Image cr: Youtube Screengrab
Kolkata: A underwater tunnel project undertaken by the Kolkata Metro Rail Corporation beneath the Hooghly river is expected to be operational by 2023, as per media reports.
The project is meant to expand KMRC'S east-west corridor, spanning the Hooghly river for 500 metres to construct the twin tunnels.
India's first underwater metro train is already being compared with Eurostar, a connecting train for London and Paris.
The train will be travelling at a depth equivalent to a 10-storey submerged structure, as per estimates.
The twin tunnels have been built using 1.4 m wide concrete rings, and to stop water from entering hydrophilic gaskets have been installed.
The project comes at a cost of Rs 8,600 cr, according to media reports.
After the Howrah Metro Station has been made operational, the Hauz Khas Metro Station in Delhi will become the second deepest station to function in India at 29 metres depth.
The underwater metro stop will be run at a depth of 33 metres.
Currently, Kolkata's metro green line functions between Sector 5 to Howrah, travelling 6.5 kilometres.
Once the new project is completed, it will increase the travel connectivity from Sector 5 to Howrah.
- Mumbai's newest attraction is its 5-km sea promenade along Coastal Road
- Newly launched booking site QuietHotelRooms.com helps travellers sleep better
- Air Canada to begin operations after flight attendants decide to end strike
- Kolkata gets its first direct Metro to airport; PM Modi set to open 3 game changing routes on Aug 22
- Air Canada flights remain grounded as striking union defies order to resume work
- Uber introduces Intercity Motorhomes as it expands to 3,000 routes in India
- High Commission issues advisory for Indians travelling to Malaysia
- Grand Egyptian Museum to open its doors on Nov1
- Aadhaar OTP now mandatory for online Tatkal train bookings
- PM Modi to launch Bengaluru Metro's Yellow Line, new Vande Bharat Express
Air New Zealand has announced plans to host a live inflight concert, ‘SYNTHONY in the Sky’, on Dec 4 aboard Flight NZ1331 from Auckland to Sydney.
Qatar Airways will move its New York operations to The New Terminal One at John F. Kennedy International Airport (JFK) in 2026. As part of the relocation, the airline plans to open a 15,000-square-foot lounge, its first dedicated facility in both New York City and the United States.
All Air Canada planes remained grounded late Saturday despite the Canadian government intervening to end a strike called by cabin crew members that resulted in hundreds of flights being cancelled and triggered chaos, media reports said.